PT Yasui Era Enjiniring (YEE) is a system integrator and industrial automation company. We have helped industries solve their most pressing instrumentation, control and electrical automation problems.

LATEST NEWS
CONTACTS
Published
May, 2018
Category
Automation System
client
Automotive Industries

Jig Correcting Machine

01. Conceptualization

The first step in building a jig is to conceptualize its design. This involves understanding the problem that the jig is supposed to solve and how it can do so effectively. The design of the jig will depend on the specific requirements of the structure that needs correcting.

02. Fabrication & Assembly

The first step in building a jig is to conceptualize its design. This involves understanding the problem that the jig is supposed to solve and how it can do so effectively. The design of the jig will depend on the specific requirements of the structure that needs correcting.

After the components have been fabricated, they need to be assembled to form the complete jig. This involves attaching the components together in the correct configuration as per the design.

03. Panel Creation & PLC Programming

Depending on the complexity of the jig, a control panel may need to be created. This panel will house the controls that operate the jig. The design and fabrication of the control panel will depend on the specific requirements of the jig.

The final step in building a jig is programming it to perform the desired task. This involves writing code that controls the operation of the jig. The complexity of the programming will depend on the complexity of the task that the jig is designed to perform.

Building a jig for correcting structures can be a complex task, but with careful planning and execution, it can be a valuable tool in construction and manufacturing.